{"id":806,"date":"2020-11-16T09:44:01","date_gmt":"2020-11-16T08:44:01","guid":{"rendered":"https:\/\/www.sinergoservice.com\/?p=806"},"modified":"2020-11-16T09:44:01","modified_gmt":"2020-11-16T08:44:01","slug":"the-live-loading-system-is-a-new-frontier","status":"publish","type":"post","link":"https:\/\/www.sinergoservice.com\/en\/italiano-ce-una-nuova-frontiera-da-adottare-sugli-impianti-termo-elettrici-scopri-il-sistema-live-loading\/","title":{"rendered":"There is a new frontier to be adopted on thermoelectric power plants. Discover the live loading system"},"content":{"rendered":"<p><span lang=\"EN-US\">There are numerous problems that must be faced every day on a thermoelectric power plants, and certainly steam valves, which work in extreme conditions, are a &#8220;sore point&#8221;, in fact they require continuous attention and maintenance (thus generating a necessary investment of time and money). <b>\u00a0<\/b><strong>Sinergo Service<\/strong> collaborates (and is an exclusive distributor) with <strong>Chesterton<\/strong> <strong>Italia<\/strong> &#8211; leading international manufacturer of solutions for industry and maintenance, and has identified a high-level engineered solution, for the improvement of the valve stem sealing system systems, present in thermoelectric power plants, the live loading! Sinergo has already started a first installation at the <strong>Edison plant<\/strong> in Altomonte, and this test has received the technical approval of the proposed solution from the Milan maintenance engineering department. <\/span><\/p>\n<h3><span lang=\"EN-US\">Do you want to know all the advantages of the solution and the details to adopt it on your system? <\/span>Contact us at <a href=\"mailto:info@sinergoservice.com\">info@sinergoservice.com<\/a><b><\/b><\/h3>\n<p><\/p>","protected":false},"excerpt":{"rendered":"<p>Sinergo Service collaborates with Chesterton Italia, and has identified a high-level engineered solution for the improvement of the seal system on the stem of steam valves, present in thermoelectric power plants, the live loading system.<\/p>\n","protected":false},"author":2,"featured_media":810,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":[],"categories":[43],"tags":[61,161,178,222,233,236,246,247,248,249,250,251,252,253],"_links":{"self":[{"href":"https:\/\/www.sinergoservice.com\/en\/wp-json\/wp\/v2\/posts\/806"}],"collection":[{"href":"https:\/\/www.sinergoservice.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.sinergoservice.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.sinergoservice.com\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.sinergoservice.com\/en\/wp-json\/wp\/v2\/comments?post=806"}],"version-history":[{"count":7,"href":"https:\/\/www.sinergoservice.com\/en\/wp-json\/wp\/v2\/posts\/806\/revisions"}],"predecessor-version":[{"id":814,"href":"https:\/\/www.sinergoservice.com\/en\/wp-json\/wp\/v2\/posts\/806\/revisions\/814"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.sinergoservice.com\/en\/wp-json\/wp\/v2\/media\/810"}],"wp:attachment":[{"href":"https:\/\/www.sinergoservice.com\/en\/wp-json\/wp\/v2\/media?parent=806"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.sinergoservice.com\/en\/wp-json\/wp\/v2\/categories?post=806"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.sinergoservice.com\/en\/wp-json\/wp\/v2\/tags?post=806"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}